The Director OCDC
The Director OCDC
Home | Benefits | Catalog | Installation Guide | Videos | Warranty | Contact Us

INSTALLATION OF THE DIRECTOR OCDC

The Director OCDC is installed in five simple steps:

The Director OCDC Installation

Mower before installation of The Director OCDC.

The Director OCDC Installation

First step is to completely remove the factory discharge chute.

The Director OCDC Installation

Cut out the supplied punch template, tape in place and center-punch
for holes. Drill pilot holes and increase size to 1/2" inch.

The Director OCDC Installation

Bolt upright in place using supplied hardware. Do not completely tighten
nuts at this point, just tighten enough so that upright does not move.

The Director OCDC Installation

Hook s-rod to control handle and flap. Insert hinge rod with
rubber flap underneath rod as shown. Slide washer in place
and insert spring clip. Test control handle for operation and
adjust if necessary. Tighten nuts and you are ready to go.

Chute flap is easily removed without tools and upright
does not interfere with the use of a vacuum.

The Director OCDC
The Director OCDC
Home  |  Benefits  |  Catalog-Kits |  Catalog-Parts  |  Installation Guide  |  Videos  |  Warranty  |  Contact Us

ŠThe Director OCDC. All rights reserved.

catalog pulldown menu